incinerator waste heat boiler for sru

zozen boiler

ZOZEN has built six fully automatic lines for the production of convection pipe, coil pipe, threaded pipe, membrane wall, serpentine tube and header. The parts so produced have consistent dimensions that enable easy assembly and ten years’ extension of a boiler’s life.

ZOZEN's main products include industrial boilers, power station boilers, waste heat recovery devices (HRSG), special waste heat boilers, pressure vessels and other five series with more than 400 varieties of specifications, mainly classified as: 10 ~ 220 t/h series power station boilers; SHL series bulk coal-fired Steam and hot water boilers; SZL series pipe assembly boilers; DZL series shell boilers; WNS series, SZS series of oil/gas fired boilers; YLL series of coal-fired thermal fluid heater; YYW series of fuel gas thermal fluid heater; biomass fuel boiler steam and gas combined cycle waste heat boilers, special waste heat boilers and so on.

more +

- WELCRON

PROJECT : SK E;C PDH PJT Contractor : SK E;C Boiler Capacity : 1,377.68t/h X 546℃ (Spent Air) Steam Generation : 91.22t/h X 45.5kg/㎠ X 390℃ Number of Boiler : 1

Contact us

Top Five Fundamental Integrity Issues for SRU Waste Hea

Top Five Fundamental Integrity Issues for SRU Waste Heat Exchangers (Boilers) Panel Discussion Presented at the Brimstone Sulfur Symposium Facilitated by Brimstone STS Limited

Contact us

Item List for Enlistment Date :04/10/2018 09:36:

Item List for Enlistment Date :04/10/2018 09:36:42 Page 1 of 17 Sr No Item Code Item Description Group Description 1 06BA BOILER-FLUIDISED BED COMBUSTION BOILER ; HRSG 2 06BB BOILER - INDUSTRIAL WATER TUBE >25TPH BOILER ; HRSG 3 06BC BOILER- PACKAGE( FIRE TUBE UP TO 25 TPH) BOILER ; HRSG

Contact us

Advancing Process Understanding - Virtual Material

Advancing process understanding Our flagship product; VMGSim is a world-class, rigorous and comprehensive steady-state process simulator developed with an integrated flowsheet design in a user-friendly, modern environment.

Contact us

Home | EUROP

Europem is a leading supplier of Environmental Payback Projects. Our Technologies and Processes transform an environmental problem into a revenue stream for our clients.

Contact us

Advancing Process Understanding - Virtual Material

Advancing process understanding Our flagship product; VMGSim is a world-class, rigorous and comprehensive steady-state process simulator developed with an integrated flowsheet design in a user-friendly, modern environment.

Contact us

EASIER STARTUPS IMPROVE SULFUR PLANT RELIABILI

EASIER STARTUPS IMPROVE SULFUR PLANT RELIABILITY from Hydrocarbon Engineering magazine, February 2002 Page 2 Ortloff concluded that these problems (catalyst sulfation, heat damage, furnace overheating) could all be

Contact us

pumpfundamentals - Pump SEARC

On this site you will learn about pumps and pump systems. You can do calculations and trouble-shoot existing pump systems, everything is FREE. How about videos of interesting experiments with fluids. Need a shoulder to cry on, check out the forum

Contact us

caustic scrubber and sulphuric acid tail gas optio

3 The effluent gas from the Incinerator Waste Heat Boiler is desuperheated in a venturi scrubber by intimate contact with a 10 wt % caustic solution.

Contact us

pumpfundamentals - Pump SEARC

On this site you will learn about pumps and pump systems. You can do calculations and trouble-shoot existing pump systems, everything is FREE. How about videos of interesting experiments with fluids. Need a shoulder to cry on, check out the forum

Contact us

pumpfundamentals - Pump SEARC

On this site you will learn about pumps and pump systems. You can do calculations and trouble-shoot existing pump systems, everything is FREE. How about videos of interesting experiments with fluids. Need a shoulder to cry on, check out the forum

Contact us

Advancing Process Understanding - Virtual Material

Advancing process understanding Our flagship product; VMGSim is a world-class, rigorous and comprehensive steady-state process simulator developed with an integrated flowsheet design in a user-friendly, modern environment.

Contact us

ORTLOFF ENGINEERS, LTD. Summary of SULFU

ORTLOFF ENGINEERS, LTD. Summary of SULFUR RECOVERY PROJECTS YEAR PLANT OWNER ; PLANT LOCATION CONTRACTOR(S) PROJECT DESCRIPTION SIZE LT/D 1985 Troubleshooting investigation to determine

Contact us

Technical advantages

Boiler body uses the forced circulation in the high temperature area to make sure all heating areas can be cooled down and avoid vaporization; The explosion door and flame detector are equipped for safe and reliable operation.

zozen boiler zozen boiler

Leave Your Message!

If you want to know more about our products or have after-sales problems, you are welcome to contact us.
Contact us for more details about our boilers, solutions and services.

Contact us